Make plasma visible.Bring fusion closer to people.
We’re developing a tabletop real-plasma model with shaped magnetic fields to support introductory teaching, public engagement and informed conversations about fusion.
Show real plasma
Give audiences a visible starting point for understanding fusion science.
Explain magnetic confinement
Connect shaped magnetic fields to introductory confinement concepts.
Support teaching and outreach
Bring a physical demonstration into lessons, exhibitions and public events.
Enable informed conversations
Help audiences ask questions about fusion’s potential and challenges.
Registering interest is free + non-binding, and supports us in getting softfunding, to get started building.How we handle your data: Privacy Notice.

The future we want to help build:
We’re students. We want a future to look forward to - and we’re ready to work for it.
Power progress. Protect the climate.
- No direct CO₂ emissions during fusion power generation.
- Small fuel quantities. Deuterium from seawater; tritium bred from lithium.
- A different waste legacy. Fission waste includes substances that persist for thousands of years. Suitable activated fusion materials could become recyclable within about 100 years.
Fusion materials — ITERHow is fusion different from fission?
Fusion combines light nuclei; fission splits heavy nuclei. Proposed deuterium–tritium fusion plants do not require uranium or plutonium fuel and do not produce spent fission fuel.
Spent fission fuel contains many radioactive substances with different half-lives. Some decay relatively quickly; others persist for thousands of years or longer.
Deuterium–tritium fusion produces activated plant components rather than spent fission fuel. ITER anticipates that suitable materials could become recyclable or reusable within about 100 years, depending on material selection.
This is a potential recycling timescale, not a universal half-life or a guarantee that all fusion waste becomes harmless after 100 years. Activated components and radioactive tritium still require controlled management.
Deuterium can be extracted from seawater. Tritium would need to be bred from lithium; reliable breeding remains an engineering challenge.
Clean power beyond the weather.
- Beyond the weather. Potential to generate without relying on sunshine or wind.
- Alongside renewables. Reliable power for homes and industry.
- MW target. Planned electrical output of CFS’s ARC fusion plant.
The future is a shared responsibility.
- Build for those who follow. Take responsibility for what we leave behind.
- No runaway chain reaction. Fusion stops when the required conditions are lost.
- No uranium or plutonium fuel required. A different proliferation profile, with tritium still requiring controls.
Fusion safety — IAEASafety by design. Responsible fuel handling.
Fusion requires precisely controlled conditions. If those conditions are lost, the reaction stops, preventing a runaway chain reaction or fission-style core meltdown.
Deuterium–tritium fusion requires neither uranium enrichment nor plutonium fuel. Responsible development includes secure tritium handling, material accounting and engineered safeguards for radioactive materials and other plant hazards.
Why pursue fusion if we have wind and solar?
Wind and solar output changes with the weather and time of day. Fusion could add controllable low-carbon generation, helping balance supply when renewable output is low.
Concentrated power generation
Substantial output at individual power-station sites, offering another option where land use, landscapes and local impacts constrain expansion.
Power our cities. Heat our homes.
Future fusion plants could produce electricity and supply district heating, making more use of the energy they generate.
The potential of concentrated power generation:
- Fusion
- ≈3,300
- MW/km²
- Conceptual estimate
- Utility-scale solar
- 30–36
- MW/km²
- Planning assumption
- Onshore wind
- ≈3
- MW/km²
- Including turbine spacing
Illustrative rated-capacity estimates from different studies, not average output or a like-for-like land-use comparison.
Sources and context
Fusion
A 2001 conceptual study estimated approximately 300 m² per MW of plant capacity. Converting that estimate gives approximately 3,300 MW/km². This is a historical design estimate, not measured commercial performance.
Fusion land-requirement study — 2001Solar and wind
A 2018 NREL technical-potential methodology uses approximately 30–36 MW/km² for solar and 3 MW/km² for wind. These represent rated capacity per area, not average electricity delivered.
NREL technical-potential methodology — 2018Comparison limits
The studies use different dates, assumptions and land boundaries. Wind-farm spacing can remain available for farming and other activities; rooftop solar uses existing surfaces. Actual fusion sites must include supporting infrastructure. These figures do not establish a validated land-saving ratio.
Dependable generation
The US Department of Energy identifies on-demand generation as a potential benefit of fusion. This does not mean uninterrupted operation or eliminate the need for storage and grid investment.
US DOE — on-demand generation potentialPlant scale
Max Planck IPP describes future plants producing 1–1.5 GW of electricity, with buildings comparable in size to existing large power stations. This is a prospective design scale, not demonstrated performance or Aurora’s capability.
Max Planck IPP — future plant scaleDistrict heating
Fusion researchers have examined combined electricity and district-heat production. Viability depends on plant design, heat-network temperatures, nearby demand and economics. Extracting useful heat can reduce electrical output.
Fusion research — electricity and district heatCombined heat and power
Cogeneration recovers heat for homes, businesses or industry alongside electricity generation.
European Commission — cogenerationLocal considerations
Noise, landscape changes, shadow flicker and warning lights can affect acceptance of wind projects. Fusion plants will also require environmental assessment, infrastructure and community engagement.
Denmark’s Transport Authority — wind-project acceptanceLocal acceptance in Denmark
In a 2023 IDA survey, 21% said living near wind turbines would bother them to a high or very high degree. This measured stated expectations, not actual neighbour experiences. The survey also found greater acceptance of wind and solar than of motorways and airports.
IDA — 2023 survey of expected neighbour impactsImportant context
These sources do not establish proven comparative land savings, fewer local disturbances or greater public acceptance for fusion. Commercial fusion costs, availability, operating lifetimes and maintenance requirements remain to be demonstrated.
SDG icon attribution
Official icons: United Nations Sustainable Development Goals. SDG asset-use guidelines.
The content of this publication has not been approved by the United Nations and does not reflect the views of the United Nations or its officials or Member States.
That future starts with people who understand the science.
Our real-plasma model gives educators and organisations a tangible way to introduce plasma, explain magnetic confinement and start conversations about fusion.
- New fusion engineers needed, according to an industry estimate cited by Tobias Petrini, Business Finland, at Nordic Fusion Forum 2026.
- Of UK adults said they knew a fair amount or a lot about fusion.
- DESNZ Public Attitudes Tracker, spring 2026
- of
- European institutions in our review had identified on-campus equipment for physical magnetic-confinement experiments.
- Aurora Confinement desk research, October 2026
About this research
We reviewed 72 European institutions across 22 countries using FuseNet, EUROfusion and institution-specific sources. We identified on-campus physical magnetic-confinement equipment at 13 of them.
The review covers toroidal and linear magnetic-confinement devices. It is not exhaustive: equipment not identified in public sources is not confirmed absent. Institutions may also conduct research through partner laboratories, remote access or simulations. The review does not establish student access or teaching use.
Where could you use the model?
Bring real plasma into teaching, exhibitions and conversations about fusion.
University teaching
Give students a physical reference for introductory plasma and magnetic confinement concepts.
Museums and science centres
Turn unfamiliar science into something visitors can see, question and explore.
Industry outreach
Give visitors and prospective recruits a focal point for discovering the science behind fusion.
Policy and fusion events
Bring a tangible scientific reference into conversations about fusion’s potential and challenges.
Applications shown are illustrative. The model is in development.
Registering interest is free + non-binding, and supports us in getting softfunding, to get started building.How we handle your data: Privacy Notice.
Fusion outreach: a full lecture in 48 hours.

- registrations within 48 hours
- more on the waiting list
This lecture reflects the team’s outreach activity and audience interest in fusion education. It is not evidence of institutional purchase demand or the model’s performance.
A multidisciplinary student team.
Aurora Confinement is a student-led research initiative bringing together talent from Technical University of Denmark and University of Copenhagen. The project is pre-incorporation and at an early stage of development. No university endorsement or institutional partnership is implied.
Meet the team
Bring plasma to your institution.
Registering interest is free + non-binding, and supports us in getting softfunding, to get started building.How we handle your data: Privacy Notice.